Case Study:

NBC Media Lab

Scope:

JK2 Construction remodeled an existing 6,588-square-foot space that retained the original exterior appearance of “The Garden of Allah” hotel and villas in Hollywood. The interior of the finished product became a clean, high-tech space with custom finishes needed for the lab’s operation. JK2 Construction handled demolition of select existing structures and complete interior demolition, including electrical and mechanical systems, and new construction. The building was entirely re-purposed with impressive results.

Challenges:

While the exterior of this project retained its appearance, the complete change inside meant JK2 Construction had to overcome many obstacles. First, the project is located in the middle of Universal Studios Park. This meant the job trailer was a quarter mile away, and workers had to be bussed to and from the project site. We also had to complete construction while the rest of the park remained open. Because of the timeline of the project, we had to juggle installations in the final weeks of the project with drywall, mechanical and electrical. We also overcame several challenges related to locating and relocating existing stormwater, sanitary, chilled water, domestic water and gas lines, as well as structural supports that were needed for a new air handler unit. Even so, JK2 was very proud to complete work on time and to the client’s liking.