Loews Royal Pacific Resort

CASE STUDY:

Royal Pacific Resort

Scope:

A complete demolition and build back of the Orchid Court Lounge. The demolition of office and back of house spaces then transform into the Tuk Tuk Market, as well as the renovation of the existing check in, concierge and service areas throughout the lobby.

Challenges:

The phased construction both accommodated and complimented the normal operations of this exclusive resort. Installing the plumbing and electrical components was a major undertaking considering the twenty-year-old post tension cabling running through the slabs of each floor. With over 30 year history with Universal Orlando Resort, JK2 is attuned to the logistics required to meet and exceed client expectations in both quality and safety.

Orlando City

CASE STUDY:

Orlando City SC Training Grounds

Scope:

Demolition of 30,000 square foot MLB Houston Astros spring training clubhouse, built out and transformed into the MLS Orlando City Soccer Club training grounds.  This project encompassed bringing together all pertinent needs of the team into one facility to include locker rooms for the team, visitors and staff, training and fitness rooms, staff offices, press room, therapy room, cafeteria and players’ lounge.

Challenges:

JK2 worked with the club and architect in a combined effort to reduce the budget by nearly 50%, procure FF&E for the entire facility without any interior design plans and complete the project in six months.