The Hello Kitty Store

CASE STUDY:

Hello Kitty / Betty Boop Store

Scope:

Interior and exterior demolition of the “I Love Lucy Store and Museum”.  All Lucy memorabilia had to be carefully removed and prepared for shipping prior to the demolition, overseen by the Arnaz Family.  Once complete the store interior was removed back to the structure, and the exterior windows, doors, and partial façade removed and prepared for new materials.  The store was themed in three different finishes and merchandise for 1) Hello Kitty, 2) Universal Studios Store, and 3) Betty Boop.  Exterior work was performed to change the finishes and window displays of the entire structure prior to painting and adding canopies. 

Challenges:

All new mechanical and electrical systems were added to the existing HVAC and electrical equipment, requiring cleaning and updating.  Floor prep and leveling had to be completed prior to laying the laser cut specialty flooring (each laser-cut tile was numbered from the factory prior to shipping) so that the specified pattern could be duplicated.  Work hours and deliveries were performed after park closing because the building sits in the middle of the park.

NBC Media Lab

Case Study:

NBC Media Lab

Scope:

JK2 Construction remodeled an existing 6,588-square-foot space that retained the original exterior appearance of “The Garden of Allah” hotel and villas in Hollywood. The interior of the finished product became a clean, high-tech space with custom finishes needed for the lab’s operation. JK2 Construction handled demolition of select existing structures and complete interior demolition, including electrical and mechanical systems, and new construction. The building was entirely re-purposed with impressive results.

Challenges:

While the exterior of this project retained its appearance, the complete change inside meant JK2 Construction had to overcome many obstacles. First, the project is located in the middle of Universal Studios Park. This meant the job trailer was a quarter mile away, and workers had to be bussed to and from the project site. We also had to complete construction while the rest of the park remained open. Because of the timeline of the project, we had to juggle installations in the final weeks of the project with drywall, mechanical and electrical. We also overcame several challenges related to locating and relocating existing stormwater, sanitary, chilled water, domestic water and gas lines, as well as structural supports that were needed for a new air handler unit. Even so, JK2 was very proud to complete work on time and to the client’s liking.

HoneyDukes™

HoneyDukes™ – Universal Studios

Negotiated Design/Build project and Pre-construction services for a heavily themed venue. The expansion of the Candy store included new displays, cabinetry, and themed finishes. Store remained open during entire expansion and remodel. Additional support and construction services provided for the installation of props and animatronics.

Simpson’s™ Games – Design/Build

Simpson’s™ Games – Design/Build

Design/Build General Contractor for the renovation of existing hardscape area, which included heavy civil engineering to work with existing drainage and grading but allowing for ADA access to the new game structures, and construction of the new façade to fit prefinished graphic wraps.